- The Actual Passing Score for Part 1
- How 80 Questions Break Down by Domain
- Why 75% Feels Harder Than It Sounds
- Scoring Mechanics and What PSI Reports
- Which Domains Decide Your Score
- The Retake Math if You Fall Short
- Building a Study Schedule Around the Score Target
- How Your Reference Books Affect Your Score
- FAQ
- Part 1 requires 75% correct: 60 of 80 questions, in 200 minutes.
- Domain 1 (General Knowledge and Electrical Installation Requirements) carries 13 questions, the largest single block.
- You can miss at most 20 questions across all ten domains and still pass.
- A failed part costs $89.69 to retake, so precision matters more than speed.
The Actual Passing Score for Part 1
Under the PSI candidate information bulletin revised April 3, 2026, the EE-98 Part 1 exam (Commercial and Industrial) consists of 80 questions administered in 200 minutes. The passing requirement is 75% correct, which equals 60 of the 80 questions. There is no partial credit tier and no curve - you either land on 60 correct answers or above, or you don't pass that sitting.
This number is the single most important planning figure for anyone preparing for the New Mexico Regulation and Licensing Department's Construction Industries Division (CID) trade exam. It tells you exactly how much margin you have for error: 20 questions, spread across ten domains, before you drop below the threshold. If you're still mapping out what those ten domains actually cover, the NM-EE98 Exam Domains 2026 guide walks through each one in detail.
How 80 Questions Break Down by Domain
PSI's official question allocation for Part 1 is not evenly distributed. Some domains carry far more weight than others, and knowing the exact split changes how you should allocate study hours. Here is the published breakdown across the ten domains:
| Domain | Topic | Questions |
|---|---|---|
| 1 | General Knowledge and Electrical Installation Requirements | 13 |
| 2 | Services, Feeders, and Branch Circuits | 10 |
| 3 | Overcurrent Protection | 5 |
| 4 | Grounding and Bonding | 10 |
| 5 | Conductors and Cables | 8 |
| 6 | Raceways and Boxes | 8 |
| 7 | Hazardous Locations, Special Occupancies, and Special Equipment | 10 |
| 8 | Lighting, Signs, and General-Use Equipment | 6 |
| 9 | Motors, Transformers, and Generators | 6 |
| 10 | New Mexico State Code | 4 |
Domain 1 alone accounts for more than 16% of the exam, making it the single largest content area. Combined, Domains 1, 2, 4, and 7 - General Knowledge, Services/Feeders/Branch Circuits, Grounding and Bonding, and Hazardous Locations/Special Occupancies - make up 43 of the 80 questions. That's more than half your score sitting in just four of the ten domains.
Domain 1: General Knowledge and Electrical Installation Requirements
As the largest domain at 13 questions, this section touches definitions, general code requirements, and installation practices that show up again inside other domains. Weak fundamentals here tend to cost points across the whole exam, not just this section.
- Know code article organization well enough to navigate quickly under time pressure
- General installation requirements applicable across commercial and industrial settings
- Terminology precision - many wrong answers hinge on a single misread term
Why 75% Feels Harder Than It Sounds
A 75% pass mark sounds achievable on paper, but in practice it demands consistent performance across every domain - not just strength in one or two favorites. Because the smallest domains (Overcurrent Protection at 5 questions, New Mexico State Code at 4 questions) still contribute directly to your final tally, a candidate who ignores "minor" sections can lose points they didn't plan for.
Consider the math: if you score perfectly on Domains 1, 2, and 4 (33 questions) but miss half of everything else (23-24 questions out of 47), you land well below 60 correct. There's no way to compensate for broad weakness by over-mastering a narrow slice of content. This is exactly why candidates who ask how hard the NM-EE98 exam actually is often underestimate the breadth requirement more than the depth requirement.
Key Takeaway
Treat every domain, even the 4-question New Mexico State Code section, as a pass/fail contributor. Skipping small domains to focus on big ones is the most common way candidates land at 55-58 correct instead of 60.
Scoring Mechanics and What PSI Reports
The exam is computer-administered through PSI and delivered as multiple choice, open book. You'll know your pass/fail result at the testing center once you complete the 200-minute session. Because the format is open book, the scoring model assumes you're navigating your code books efficiently - the clock is running the entire time, including the minutes spent flipping to NEC Article 250 for a grounding question or cross-referencing the 2020 New Mexico Electrical Code for a state-specific amendment.
A silent, nonprinting, nonprogrammable calculator is permitted, which matters for load calculation and conductor sizing questions scattered through Domains 2, 3, 5, and 9. Practicing those calculations until they're automatic protects your time budget - roughly 2.5 minutes per question on average across 80 questions and 200 minutes, though some questions will take far longer than others.
Which Domains Decide Your Score
Given the fixed 60-correct target, prioritizing study time by question count is the most defensible strategy. Here's how the ten domains rank by point value, from highest to lowest stakes:
- Highest priority (10 questions each): Services, Feeders, and Branch Circuits; Grounding and Bonding; Hazardous Locations, Special Occupancies, and Special Equipment
- Very high priority (13 questions): General Knowledge and Electrical Installation Requirements
- Medium priority (8 questions each): Conductors and Cables; Raceways and Boxes
- Moderate priority (6 questions each): Lighting, Signs, and General-Use Equipment; Motors, Transformers, and Generators
- Lower priority but still decisive (4-5 questions each): Overcurrent Protection; New Mexico State Code
Notice that Domain 10, New Mexico State Code, is the smallest at only 4 questions, but it's also the domain most candidates from other states or general contracting backgrounds underestimate. It covers amendments and provisions specific to New Mexico rather than baseline NEC content, so generic electrical knowledge won't carry you through it. The full NM-EE98 Study Guide for 2026 breaks out state-specific study resources separately from national code material for exactly this reason.
Domain 4: Grounding and Bonding
Tied for second-highest question count at 10, grounding and bonding questions frequently combine multiple code sections into a single scenario - sizing a grounding electrode conductor while also confirming bonding jumper requirements, for instance.
- Grounding electrode system requirements for commercial and industrial services
- Equipment grounding conductor sizing tied to overcurrent device ratings
- Bonding requirements for metal raceways, enclosures, and structural steel
The Retake Math if You Fall Short
If you score below 60 correct, you don't need to retake all three parts of the trade exam - only the failed part. A Part 1 retake costs $89.69, compared to the $269.06 initial fee that covers Parts 1, 2, and 3 together. That's a meaningful cost difference, and it's worth internalizing before your first attempt: a rushed, underprepared sitting that fails by two or three questions is an avoidable expense.
Your passing exam scores remain valid for one year, which gives some flexibility if you pass Part 1 but need another attempt at Part 2 (Residential, 40 questions, 100 minutes) or Part 3 (Specialties, 50 questions, 135 minutes). For a full breakdown of every fee involved in the qualifying-party process, see the NM-EE98 Certification Cost breakdown for 2026.
| Item | Cost |
|---|---|
| Initial three-part trade exam (Parts 1, 2, 3) | $269.06 |
| Retake of one failed part | $89.69 per part |
| Business and Law exam (separate requirement) | $68.88 |
| Qualifying-party application | $30 plus $6 certificate fee per classification |
Building a Study Schedule Around the Score Target
Because the passing score is fixed and known in advance, you can reverse-engineer a study plan directly from the question allocation rather than guessing at generic study advice. Spend more calendar time on domains with more questions, but never skip the small ones entirely - Overcurrent Protection and New Mexico State Code combined are still 9 questions, more than enough to swing a borderline score.
General Knowledge and Services/Feeders/Branch Circuits
- Cover Domain 1 (13 questions) and Domain 2 (10 questions) first since together they're nearly 29% of the exam
- Practice navigating your bound 2020 NEC quickly for these article ranges
Grounding/Bonding and Hazardous Locations
- Work through Domain 4 and Domain 7, another 20 questions combined
- Drill grounding electrode conductor sizing and special occupancy classifications
Conductors, Cables, Raceways, and Boxes
- Domains 5 and 6 together add 16 questions
- Focus on conductor ampacity tables and raceway fill calculations
Lighting/Signs, Motors/Transformers, Overcurrent, and NM State Code
- Close out Domains 8, 9, 3, and 10 - the remaining 22 questions
- Give the 2020 New Mexico Electrical Code amendments dedicated time here
A short spaced-repetition pass in the final week, reviewing flagged questions from full-length practice runs on our NM-EE98 practice test platform, tends to be more effective than cramming new material two days before your PSI appointment.
How Your Reference Books Affect Your Score
Because Part 1 is open book, the score target of 60 correct assumes you're testing with the approved references: the 2020 NEC or NEC Handbook, the 2020 New Mexico Electrical Code, and the 2007 National Electrical Safety Code. These must be bound - highlighting, underlining, and permanent tabs are allowed, but handwritten notes, loose papers, and temporary tabs are prohibited and can be flagged at check-in.
Candidates who prepare their reference books in advance - consistent tabbing by article, clean highlighting for frequently cited sections - routinely move faster through the 200-minute window, leaving more time for the harder calculation-based questions in Domains 2, 3, 5, and 9. If you haven't finalized your reference setup yet, the NM-EE98 Cheat Sheet lists the must-know article numbers worth tabbing first.
Key Takeaway
Your passing score depends as much on how fast you can find information in your code books as on how much you've memorized. Tab your references before test day, not during it.
It's also worth understanding where Part 1 fits into the bigger licensing picture. Passing this part alone doesn't complete your EE-98 trade qualification - Part 2 (Residential) and Part 3 (Specialties) are also required unless CID grants an approved exemption, and Business and Law is satisfied separately, either by exam or an approved course. For a full picture of what's required beyond the passing score itself, review the NM-EE98 Requirements guide and the broader first-attempt study guide. Once you've locked in your target score, running timed sets on our practice test site is the most direct way to confirm you're consistently clearing 60 out of 80 before you book your PSI appointment.
FAQ
You need 75% correct, which is 60 of the 80 questions, within the 200-minute time limit. This applies specifically to Part 1, Commercial and Industrial, per PSI's bulletin revised April 3, 2026.
The question counts and time limits differ - Part 2 has 40 questions in 100 minutes and Part 3 has 50 questions in 135 minutes - but Part 1 is the exam covered in detail on this page. Check the specific bulletin details for each part before scheduling.
You can miss up to 20 of the 80 questions and still pass, since 60 correct answers meets the 75% threshold. Missing 21 or more means you fall short.
You retake only the failed part for $89.69, rather than paying the full $269.06 initial fee again for all three parts. Your qualifying-party approval remains valid for six months, so schedule the retake within that window.
A silent, nonprinting, nonprogrammable calculator is permitted and is useful for load calculations and conductor sizing in domains like Services/Feeders/Branch Circuits and Motors/Transformers/Generators, but it doesn't replace knowing where to find information in your bound reference books.